Maharashtra’s Roads.
Built to Last.

For 27 years, D R Construction has delivered government-grade road infrastructure across Maharashtra — from rural PMGSY lanes to four-lane National Highways. When the project is complex, we’re at our best.

Did You Know ?

Years of experience

Government Projects

Govt Department

District Served

Heavy machine served

Area of work :



What we build

Six Domains.
One Standard of Excellence.

National & State Highways

Four-lane EPC contracts, periodical renewal, FDR, strengthening — executed on NHAI and PWD standards. Experience on NH-66 (Panvel–Goa corridor), NH-548H, NH-166G.
FDR
EPC Mode
Four-Lane

Rural Road Connectivity

Village-level connectivity under PMGSY & MMGSY. Black topping, WBM, drainage, and 5-year maintenance contracts (PBMC) — covering the last mile for Maharashtra’s villages.
PMGSY
MMGSY
PBMC

Dams, Weirs & Water Works

Minor irrigation tanks, KT weirs with FRP needle replacement, head regulators and canal work. Forest clearance navigation included for sensitive zone projects.
MI Tanks
KT Weirs
MOEF Clearance

Military & Defence Works

High-security perimeter walls, defence area roads, and sports complex construction. Executed for MES at AFS Bidar, GE Panaji (Goa), and Ahmednagar — security clearance works.
MES
Security Clearance
AF Stations

Industrial Area Infrastructure

Road networks, drainage, and surface works within MIDC industrial areas. Executed at Kagal-Hatkanangale 5-Star Industrial Area and Gadhinglaj Industrial Area, Kolhapur.
MIDC
Industrial Roads
4-Lane

Urban Roads & Municipal Works

Concrete road construction, RCC gutters, drain works within municipal limits. Projects under KMC, Malvan, Sangli Miraj urban zones — including CM Amrut Nagarothana.
Urban Drains
Concrete Roads
KMC


Why D R Construction

We Don’t Just Build Roads.
We Solve Hard Problems.

Most contractors follow the standard playbook. We rewrite it when the standard playbook fails.

Own Equipment Fleet — No Subcontracting Delays
30+ owned machines including Caterpillar loaders, Tata Hitachi excavators, asphalt batch plants, paver finishers, and a full fleet of tippers. When we commit to a timeline, our machines back it up.
MOEF & Forest Clearance Experience
One of very few contractors with successful MOEF forest clearance navigation from New Delhi — under the Forest Conservation Act 1980. We handle what others walk away from.
Performance-Based Contracts — We Stand Behind Our Work
Awarded 5-year PBMC maintenance contracts by NHAI. The government only gives these to contractors they trust completely — because we’re accountable for what we build.
Airport Road & Chipi Connectivity Experience
Executed the Chipi Airport to Vengurla-Shiroda-Goa Border road project — high visibility, zero margin for delay. Delivered.

Our Equipment Arsenal

Hydrostatic Paver Finisher + WM-6 Wet Mix Paver

DM-50 TPH Asphalt Plant + Batch Type Hot Mix Plant
Caterpillar 424B JCB + L&T Komatsu PC-130 Excavator
Tata Hitachi SHINRAI Excavator (×2, BS III CEV)
Ashok Leyland 28T Dumpers (×3) + Tata Tippers (×4)
L&T Double Drum Roller 11-1190 + Single Drum 11-990HF
SLM 200 Self Loader Mixer

Toyota Hycross Hybrid + Mahindra Bolero Fleet

RMC Plant, Transit Mixer & Loader machine